GEOTHERMAL WATER PROJECT,RWANDA,AFRICA

date:2014-07-29 15:01source:未知 author:admin click:
2013 Geothermal water project at Kigali,Rwanda,Africa,elevation 2000m, Semhai company supplied 4 sets of plateau boosting pumps and 2 sets of submersible pumps, along with relative control systems.
Semhai company supplied Submersible Pump and Horizontal Multistage Boosting Pump, to transport river water to storage water tank with submersible pump and transport river water from storage tank to geothermal water hole located at plateau, elevation about 2000m, with multistage boosting pump to avoid land surface from collapsing. Total height drop is more than 800m, and 2 pump stations, lay water pipeline 3500m.


Transport river water to storage tank with submersible pump     Storage water tank, 3,000cmb

               
                                              

View inside boosting pump stations
               
              
                                                                                                                                                                    (editor:上海森海泵业)